TBL: DAYPART - Part of the day
Rough shift times, 8-hours blocks of the day.
- EXAMPLES: DAY, SWING (Evening), GRAVEYARD, etc.
The TBLC1 (START TIME range) is used to determined the general part of the day the person is working, in a situation when only times (but no shift) is specified.
TBLC1 - START TIME RANGE
Enter a time range as HHMM-HHMM
If an employee starts between the these times, he will be considered as working this part of the day.
Used to determined the general part of the day the person is working when only times (but no shift) is specified.
Example: If you enter 0400-1200 then an employee starting ON OR AFTER 04:00 am and BEFORE 12:00 noon will be consider as working this part of the day.
TBLC2 - END TIME RANGE
Enter a time range as HHMM-HHMM (Not used in base Umana)
When the shift should end to be considered in the part of the day. =>> NOT USED in the default version Umana. <<==
Used to determined the general part of the day the person is working when only times (but no shift) is specified.
TBLC3 - BackColor
Backcolor to show on calendars
© Carver Technologies, 2024 • Updated: 12/12/20